It may be getting chilly out doors, but construction crews are still busy out there! Here’s a look at a few of our projects that are under construction.
North Sioux Falls:
Hills Stainless Steel – this approximately 48,000 square foot facility will have a 2-story office attached to a climate-controlled warehouse and shop. Hills Stainless Steel is a leader in the repair of liquid transportation tankers and is currently located only in Luverne, Minnesota, though they serve the entire upper midwest. This new facility will allow Hills Stainless Steel to provide even more convenient service to their clients.
Avalon Manufacturing – a California-based company that creates commercial-grade donut and bakery equipment is relocating to South Dakota. Their new Sioux Falls facility will span 24,400 square feet for manufacturing with 8,000 square feet of office and support space.
3D Security – a brand new location for 3D Security is nearing completion with easy access on and off I-90 at Cliff Avenue. Having clients in Brookings, Huron, Mitchell, Yankton, Watertown, Worthington, MN, and Sioux City, IA, this new location creates high-visibility while maintaining convenience, and provides them with plenty of office and warehouse space to grow.
Central Sioux Falls:
First Dakota Title – a remodel that pairs functionality with aesthetics beautifully is practically complete. First Dakota Title now has a new set of stairs in their building that improves the flow within the building while adding an impressive feature to the interior design.
Mary’s Mountain Cookies – this franchise will soon be open in Sioux Falls, as crews are working hard to complete the build-out for this bakery. The buildout is in an Uptown building and will make a great addition to the other shops along the Phillips to the Falls route.
West Sioux Falls:
Sunnycrest Retirement Village – a new residential building is being constructed for Sunnycrest, which will provide 60 additional senior living units.
Cherry Lake – a new development that includes Twin Homes and Townhouses is underway in a desirable neighborhood located off of Ellis Road. The future owners of these homes will customize their home by selecting colors and material finishes for the interior, and some exterior features.
South Sioux Falls:
Harvest Church – the almost 19,000 square foot future home to Harvest Church has begun taking shape with many of the precast concrete walls already in place. This new building will allow Harvest Church to further meet their purpose of connecting people to God and each other, with a worship space that seats 365, an expansive youth room and gymnasium, a children’s wing with a nursery and education rooms, as well as a play room, kitchen and fellowship space, and offices and conference room for the pastor and staff.
Outside of Sioux Falls:
Horizon Health Care (Plankinton, SD) – an expansion and remodel is under construction that will provide the residents of Plankinton and the surrounding area with additional clinic space, which means more access to health care. The construction is being completed in three separate phases, so that the building can continue to operate and not disrupt the care currently being provided.
Horizon Health Care (Lake Preston, SD) – a new building is being constructed in Lake Preston to replace the current clinic due to aging and inability to expand.